Video Flown 12.07.2023
Shell Completion May 2024 | Occupancy July 2024
Delivering with Rent-Ready Work:
Dock Packages
100% Air Conditioned |
LED Lights
R-38 Insulation |
±2,400 SF of Spec Office Per Building
|
6 Building Industrial Park | 4008 S Signal Butte Road, Mesa, AZ
Superstition Commerce Park
Delivering Q2 2024, this Class A industrial park offers a range of buildings between 99,950 SF to 203,019 SF. The 6-building master planned site, located just 3 miles from Loop 202, sits on Signal Butte Road just south of Apple’s Global Operations Center in Mesa, Arizona. Dalfen Industrial is proud to bring this development to Mesa which boasts a talented workforce as well as a growing transportation network, continuously attracting local and global businesses.
Location Highlights
±7 miles | ±15 minutes
±28.5 miles | ±30 minutes |
Construction Updates | April 2024
Construction Updates | December 2023
Why Mesa
Industry Concentration
within a 30 minute drive
within a 30 minute drive
1,223
Manufacturing Firms Esri 2022 |
66,563
Manufacturing Employees |
421
Transportation Warehouse Firms |
37,014
Transportation Warehouse Employees |
Education
within Mesa, AZ
within Mesa, AZ
Why Industrial Here
Vertical Divider
Between 2015 and 2021, Arizona’s manufacturing share of Real GDP, a measure of economic output, grew from $25.2 billion to $32.8 billion for a rate of 30.4% – more than double the U.S. manufacturing growth rate (14%).
|
Vertical Divider
Arizona has added 14,100 jobs in manufacturing over the past year, a growth rate of 7.8%, more than double the U.S. rate of 3.7%.
|
Vertical Divider
Arizona is ranked no. 3 in the country for semiconductor manufacturing and top-5 for aerospace and defense manufacturing employment.
|